Tasks in the installation of PVC carpentry

The installation of the PVC carpentry entails certain tasks that are necessary to provide excellent service and 100% full.

These tasks depend on each construction project that is going to be carried out and for this reason, the quantity will have to be taken into account and typology of PVC carpentry to be used, must be specified in the work documentation (plans and sheets) to be placed in time and shape.

Construction process and quality control of PVC carpentry

Before starting by explaining what the construction process is of the PVC carpentry, We must previously know and understand what is done supervision of the completion of the walls in the gaps where the carpentry is placed; They must be completely smooth., plans, squared and poised.

Next, I will explain what the construction process is that follows and executes the PVC carpentry.

The first step is to verify that the gaps existing ones match the dimensions of the carpentry to be placed.

Next, those gaps in the walls must be marked for fixing the pre-fences.. Holes must be made in the walls with dimensions of 100x30x100 mm., to house the corresponding fixing pins of the pre-frames.

The third step is to fill said holes with mortar. cement, taking care to moisten all the holes before use. filled with mortar, to achieve a perfect union between the pre-fence and the walls.

Once the holes have been filled with cement mortar, you must proceed to assemble the PVC carpentry. This assembly must always be done according to the instructions of the manufacturer.

The carpentry is finally placed, sealing is carried out in the entire perimeter surface of the junction with the walls; this operation is done silicone based. All frames have rigid PVC beading. 1 mm. thick placed under pressure in grooves of the profile itself. The profile bottom horizontal of the frame cam three holes 30 mm2 section for drainage of infiltrated water, two to 1 cm at the ends and one at the center.

The measurement criterion of PVC carpentry if measured per m2 of finished surface.

Once the construction process is defined and explained, if You must be aware of what your quality control is:

Correct plumbing and flushing of the carpentry.

Make sure there are no pores or blisters in the sealing..

That all the carpentry shops have a good functioning your hardware, both opening and closing.

Existence in all carpentry of holes for water evacuation.

Finally, carry out a leak test on the carpentry.

All materials used must be approved, and They must comply with what is specified in the corresponding UNE standards.

Y, finally, carpentry reception: It is convenient that the carpentry arrives at the work before the moment of its placement, for avoid, as much as possible, to be collected. It must arrive at work already armed.